Lingen (Germany)

Map of Lingen

Map Loading...

BWR 250 MW constructed by AEG; shutdown in 1979

Facilities in Lingen

plantreactor typconstruction startoperation startshut down
LingenBWR196419681979
2004-12-31

In 2004 two events rated INES 0 occured according to the BfS annual report.

2003-12-31

In 2003 five events rated INES 0 occured according to the BfS annual report.

2001-08-03

Part failure of fire detection equipment after lightning strike.
(source: greenpeace nuclear accident calendar)